PRODUCTS
Technology / Product Information
Installation of Large Equipment for Hydropower Plants
Technology / product information
The installation of large-scale equipment in hydropower plants is a critical process requiring advanced technical expertise and precise construction management. LILAMA 10 was responsible for the installation of the rotor, turbine, stator, and gantry crane in the generator room at the Ialy Hydropower Plant (Vietnam). This project demanded the safe and precise installation of massive components, including a 400-ton, 6.2m-diameter rotor.
With extensive experience in large hydropower equipment installation, we specialize in heavy-load handling using 50–600-ton crawler cranes. Additionally, our 8+ hectare factory site allows us to manage large-scale assembly and pre-commissioning preparations. Below, we detail our installation expertise and quality control systems for hydropower projects.
[Hydropower Equipment Installation Overview]
Project: Ialy Hydropower Plant (Vietnam)
Scope: Installation of rotor, turbine, stator, and overhead crane
Rotor Specifications: 400-ton weight, 6.2m diameter, 3m height
Crane Equipment Used: Crawler cranes, gantry cranes, rough-terrain cranes
[Why Choose LILAMA 10 for Large Equipment Installation?]
✔ Expert Engineering Team
Our skilled engineers develop customized installation plans for each project, ensuring safe, efficient, and on-schedule execution.
✔ Proven Experience in Power Plant Projects
We have successfully installed heavy machinery in hydropower, gas-fired, and thermal power plants worldwide.
✔ Heavy-Lifting Capabilities (50–600T Cranes)
We deploy crawler cranes, overhead cranes, and rough-terrain cranes to handle super-heavy components with precision.
✔ Expansive Factory Site (8+ Hectares)
Our large facility supports pre-assembly, testing, and pre-commissioning of massive equipment.
✔ Thick-Steel Plate & Large-Pipe Fabrication
We have extensive experience in fabricating large structures and pipelines for power plants.
[Quality Assurance & Production System]
Strict Quality Control System
We ensure product safety and reliability through rigorous quality control using specialized measuring instruments and advanced technology. High-voltage and insulation tests are performed in accordance with the latest standards. We strictly follow labor safety regulations and focus on workforce training and education.
Comprehensive Equipment and Construction Support
Equipped with crawler cranes, gantry cranes, and rough terrain cranes, we select the optimal construction method based on site conditions. We conduct thorough site surveys to ensure safe and efficient crane operations.
Flexible Delivery Scheduling
In large-scale projects where schedule delays can directly impact overall costs, we prioritize tight schedule management and rapid response.
[Conclusion]
The installation of large equipment in hydropower plants is a crucial process that directly affects power generation efficiency and long-term operation. Leveraging our extensive experience from projects like the Ialy Hydropower Plant, Lilama 10 ensures safe and reliable installations. Through detailed construction planning, we strictly adhere to project deadlines.
Looking ahead, we aim to further enhance our technical capabilities in large equipment installation for hydropower projects and contribute to the development of sustainable energy infrastructure.
For hydropower and power plant projects in Vietnam, trust LILAMA 10 for precision heavy equipment installation.
■ For details, download our PDF or contact us today!
PICKUP
Technology / Product InformationCONTACT
Inquiry